Primary source · exact excerpt
“Within the scope of Article 1, reporting entities shall fill in the relevant templates set out in Annex II.”
Unadopted draft Ares(2026)9557732, Article 3(1), printed page 4; draft wording only
Commission Have Your Say — draft, full annex and feedback window ↗
Regulation (EU) 2024/1787 — Articles 1 and 12 ↗
Commission news announcement — 12 October 2026; consultation opened earlier on 9 October ↗
What changed
The draft and annex were released for feedback on 9 October 2026. The Commission's 12 October news item publicised that existing consultation. Articles 1 and 3 concern reports under Article 12 of Regulation 2024/1787, including associated reporting under Articles 16(2) and 18(3). Annex I proposes a common submission workflow and Annex II supplies activity-specific tables. The draft has no final act number or commencement date.
Key legal content
- Draft Articles 1 and 3; Annex I section 1Annex I, section 1, exact allocation fragment: “activities covered in Article 1(2)(a)”. Read the complete three allocations at section 1(a)–(c). Paraphrase following that text and the draft excerpt above: the template allocation concerns the parent regulation’s oil-and-gas activities in Article 1(2)(a)–(c). General descriptions of the future database do not establish new coal or importer template duties in this draft.
- Draft Annex I sections 1–3; Annex II Table 00 and Tables 1–20Paraphrase: the design includes submission through the Methane Transparency Database, reporting-entity and site/facility/asset/business-unit identifiers, verification information, equity shares, source/site reconciliation and activity-specific emissions fields. The full 35-page annex should be tested against the particular operation.
- Regulation 2024/1787, Article 12(4), final paragraphExact opening excerpt: “Until the adoption of the relevant implementing acts”. The complete linked paragraph supplies the governing text. Paraphrase: operators and undertakings must continue using the applicable OGMP 2.0 technical guidance and reporting templates pending adoption. The consultation does not suspend or replace existing reporting deadlines.
- Draft Article 4; consultation recordDraft Article 4 uses the exact placeholder fragment “[…] day”. Paraphrase: the commencement interval is not filled in, so no entry-into-force or application date can be assigned. The consultation page currently confirms feedback from 9 October to 6 November 2026, closing at midnight Brussels time.
Cross-border angle
Cross-border source · exact excerpt
“Operators and undertakings established in the Union”
Regulation 2024/1787, Article 12(2), opening words
Official source ↗
Editorial assessment: U.S.-headed groups with relevant EU operations should involve their EU reporting teams in template testing. The proposed domestic reporting workflow must be distinguished from the separate import-related provisions in Chapter 5; this draft does not by itself impose a new reporting template on every U.S. exporter.
Counsel point. Tie preparation to the actual EU reporting entity and asset; keep any importer analysis separate.
Why it matters
Editorial assessment: reporting teams have a concrete opportunity to compare their data model and verifier evidence with the proposed entity identifiers, equity-share fields, site/source reconciliation and venting/flaring records. Identifying implementation problems before 6 November can inform feedback and reduce later systems rework. This is preparation for a possible final act, not a direction to replace currently applicable templates.
For U.S. Counsel
U.S. groups with relevant EU oil-and-gas operations can test reporting-system readiness and consider feedback before 6 November. The draft does not itself create a new U.S. exporter obligation or displace the parent regulation's existing reporting requirements.
See U.S. Counsel overview →What counsel should check
- Map relevant EU operations and reporting responsibilities before assessing individual proposed tables.
- Compare current reporting data with Annex II identifiers, equity shares, verifier fields and source/site reconciliation.
- Document workflow, confidentiality and implementation concerns for possible feedback by 6 November.
- Keep complying with the existing parent regulation and applicable OGMP 2.0 arrangement while monitoring the final act.
Who may be affected
- EU oil-and-gas operators and undertakings reporting relevant assets
- EU transmission, distribution, storage and LNG operations within the parent regulation's scope
- Verifiers, reporting-system suppliers and energy compliance counsel
Key dates
- Draft Ares(2026)9557732 and consultation published
- Commission news announcement; not the opening date
- Feedback closes at midnight Brussels time
Related EU law developments
- Copyright and AI: Commission opens targeted consultation on possible future EU measuresDeadline approaching · Copyright & Artificial Intelligence · Last verified 30 September 2026
Editorial note. Exact source text is separated from editorial explanation. Always verify the complete instrument, definitions, exceptions, transitional rules and national implementation where relevant.